Bathroom Remodeling in Tampa: Cost, Timeline and What We Fix

A bathroom remodel in Tampa costs $18,000 to $75,000 or more depending on size and finish level, and takes 2 to 3 weeks of construction once the permit is issued. CraftLine Remodeling is a licensed design build contractor (CBC1269114) based at 306 E Tyler St in South Tampa. We design the bathroom, pull the permit and build it with one crew under one contract.

What a Bathroom Remodel Costs in Tampa

These ranges come from our own Tampa bathroom remodeling cost guide and include design, permit, demolition, plumbing, tile and installation.

Bathroom and scopeTypical investmentWhat it usually covers
Hall or guest bath, same layout$18,000 to $30,000Tub to shower conversion or new tub, tiled walls and floor, new vanity, toilet, lighting and fan
Primary bath, full remodel$30,000 to $50,000Walk-in tiled shower with glass, double vanity, new flooring, relocated fixtures within the room
Primary suite or layout change$50,000 to $75,000+Borrowing space from a closet or hall, moving drains in the slab, curbless shower, freestanding tub, custom vanity

The biggest price driver in Tampa is the slab. Moving a toilet or shower drain means cutting concrete, and in older homes it usually means replacing cast iron while the floor is open. We price that in writing before you sign. Bathrooms here return roughly 70 to 80 percent of their cost at resale. For a quick number on your own bathroom, try the free remodeling cost calculator.

Timeline: design and selections first, then the permit. Hillsborough reviews take 10 to 30 days and the permit runs about $500 to $1,100, which is included in our price and pulled in our name. Construction is 2 to 3 weeks on site.

Common Bathroom Challenges in Tampa Homes

Most of the bathroom work we do in Tampa comes down to three problems that sit behind the tile in older Florida homes.

1. The "Bungalow Squeeze"

Historic homes in Hyde Park and Seminole Heights often have 5x8 bathrooms that feel cramped. We specialize in "wet room" designs and curbless showers that make small vintage spaces feel larger without moving exterior walls.

2. Cast Iron Pipe Failure

Many Tampa homes built before 1970 still rely on cast iron plumbing that is failing. Every bathroom we remodel goes back to the studs, so we inspect the drain, vent and supply lines while the room is open. You get a photo of anything we find, and nothing gets closed up until you approve it.

3. The "Missing Master"

Own a ranch-style home in Carrollwood or South Tampa? Many have no true primary bathroom. We borrow space from an unused closet or hallway to fit a double vanity and a walk-in shower.

Ready to fix your layout? Schedule a Plumbing & Layout Inspection

Small bathroom upgrade with space-saving design in St. Petersburg
Kitchen remodel

Bathrooms We Remodel Around Tampa, and What Is Behind the Tile

The bathroom you have depends on when your house was built, and so does the work hiding behind it.

  • Hyde Park, Seminole Heights and Tampa Heights. 1920s bungalows with 5×8 baths, original tile, galvanized supply lines and cast iron drains. Space is tight, so curbless showers and wall hung vanities do a lot of the work.
  • South Tampa, Palma Ceia and Davis Islands. A mix of 1920s through 1950s homes, many with only one or two small baths. Updating these often means adding a real primary bath, which is where layout changes and new drain lines come in.
  • Carrollwood and Town ‘n’ Country. 1970s ranches on slab with fiberglass tub units, low soffits and narrow vanities. Tub to shower conversions are the most common job here.
  • Westchase and New Tampa. 1990s and 2000s homes with garden tubs nobody uses. Pulling the tub to build a large walk-in shower is the usual request, and the plumbing is generally in good shape.

Working on the Pinellas side? Our St. Petersburg bathroom remodeling page covers St. Pete homes and permits there.

The Order We Work In

We measure, design and give you one written price. You sign, we pull the permit, and then demolition starts. Every bathroom goes back to the studs. Nothing is tiled over or patched around. While the room is open we inspect the supply lines, the drain and vent, the framing, the subfloor and any wiring in the walls. If we find something, you get a photo and a plain explanation, and nothing gets closed up until you approve it. Once the tile is back on, nobody can inspect any of it again for thirty years.

What Is Included

  • Free in home consultation and measurement
  • Bathroom design and help choosing tile, vanity, fixtures and glass
  • One written, line by line price before any work starts
  • Permit pulled in our name and all inspections scheduled
  • Demolition to the studs, haul away and dust protection
  • Licensed plumbing and electrical work
  • Waterproofing, tile, vanity, glass, fixtures, paint and trim
  • A final walkthrough with you before the last payment

Recent Bathroom Work

In our Clearwater bathroom makeover we took the old layout down completely, enlarged the shower footprint, added a built in bench and a custom glass enclosure, and installed a floating vanity with integrated lighting. Planning a kitchen too? Running both under one permit and one crew saves time. See kitchen remodel costs and timelines in Tampa Bay.

What Homeowners Say

CraftLine holds 93 Google reviews with a 5.0 rating. We are licensed and insured (CBC1269114), BBB accredited and members of NARI Tampa Bay.

Ready for a price on your bathroom? Schedule a free in home consultation or call 813-522-4359.

Tampa Bathroom Remodeling FAQ

Most hall and guest baths we remodel cost $18,000 to $30,000. A full primary bath runs $30,000 to $50,000, and primary suites with layout changes or new drain locations run $50,000 to $75,000 or more. Permit fees, demolition and haul away are included in those numbers.

Construction is 2 to 3 weeks on site. Before that comes design, selections and the permit, which takes 10 to 30 days in Hillsborough County. You get the schedule in writing before demolition day.

Yes, whenever plumbing, electrical or walls change, which covers almost every real remodel. We pull the permit in our name, include the fee in your price and meet the inspectors.

Yes, and in Tampa homes built before 1970 we often recommend it. The floor and walls are already open, so replacing a failing cast iron drain then costs far less than breaking into finished tile later. You see photos of the pipe before you decide.

Yes. We help you pick tile, vanity, fixtures and glass, and you are welcome to bring your own inspiration or products. Every selection is written into the price before work starts.

Schedule A Complimentary Consultation