Whole Property Remodeling in Plant City, FL
A whole-home remodel in Plant City typically runs $75,000 to $150,000 for a selective renovation and $150,000 to $300,000 for a complete gut renovation. Most projects take 3 to 6 months. CraftLine is a licensed and insured Florida design build contractor. We handle the whole property under one contract: kitchen, baths, floors, systems, and structure.
CraftLine is a licensed and insured Florida contractor and a NARI Tampa Bay member, with 93 Google reviews and a 5.0 rating.
Plant City Whole-Home Remodel Costs
Whole-property cost depends on how much you keep versus gut. Here is how Plant City projects typically break down.
| Project scope | Typical cost | Timeline |
|---|---|---|
| Selective renovation (kitchen, baths, flooring, paint) | $75,000 to $150,000 | 3 to 4 months |
| Complete gut renovation (systems, layout, full interior) | $150,000 to $300,000 | 4 to 6 months |
| Room addition or expansion | $95 to $250 per sq ft | 2 to 4 months |
A 15 by 20 addition typically runs $48,000 to $65,000. Older homes that need rewiring, repiping, or structural work land toward the higher end of the gut range.
Whole-home cost in Plant City is driven by how much you gut versus keep, and by the hidden systems work older homes need. Rewiring, repiping, and structural repair on a 1920s home or a farmhouse on acreage push a project toward the high end of the gut range.
Whole-Property Remodeling in Plant City
Plant City has some of the most varied property in Hillsborough County: historic 1900s to 1920s homes near downtown, mid-century houses, farmhouses on acreage, and newer subdivision builds. A whole-home remodel here often means more than finishes, because the older and rural properties frequently need updated electrical, repiping, and structural repair.
On a farmhouse or older home on acreage, we plan around well and septic, older framing, and additions that fit the existing structure. Permitting runs through the City of Plant City inside the city limits and Hillsborough County outside them. Because we are design build, one team carries the project from drawings through the final walkthrough, which keeps a large multi-room remodel from stalling between trades.
Phasing a Whole-Home Remodel
A whole-property remodel does not have to happen all at once. On larger Plant City homes and farmhouses we often phase the work, starting with structural and systems updates, then kitchen and baths, then flooring and paint throughout. Phasing lets you spread cost and stay in the home longer, and because one design-build team carries the whole plan, the phases connect instead of fighting each other. We map the sequence during design so each stage builds toward the finished home.
What Our Plant City Whole-Home Remodels Include
- Design and 3D renderings for the full property
- Kitchen and bathroom remodels
- Flooring and interior paint throughout
- Updated plumbing and electrical to current code
- Structural changes, wall removal, and additions
- Roof, window, and exterior work as needed
- Permits and inspections through the City of Plant City or Hillsborough County
- One project manager from start to finish
How a CraftLine Project Works
- In-home consultation. We walk the space, talk through your goals and budget, and take measurements.
- Design and fixed quote. You get drawings, material selections, and a clear, itemized price before anything is torn out.
- Permits and build. We pull the permits, schedule the trades, and manage inspections so you are not chasing anyone.
- Final walkthrough. We review every detail together, and you sign off before the final payment.
Where a Plant City Whole-Home Budget Actually Goes, Room by Room
Tier numbers are useful for a lender and close to useless for planning. Here is the same money split into rooms, using line items from our own cost guides.
| Part of the house | Selective renovation | Complete gut renovation |
|---|---|---|
| Kitchen | $15,000 to $25,000 for a refresh that keeps the layout | $25,000 to $45,000 mid-range, $45,000 to $80,000 when walls move and finishes go high end |
| Primary bathroom | $18,000 to $30,000 | $30,000 to $50,000, up to $75,000 for a full spa primary |
| Second or hall bathroom | $18,000 to $30,000 each | $18,000 to $30,000 each |
| Flooring through the rest of the house | Luxury vinyl plank at $3 to $6 per sq ft installed, so $5,400 to $10,800 on an 1,800 sq ft home | Porcelain tile at $4 to $15 per sq ft in material before labor |
| Added square footage | Usually out of scope | $95 to $250 per sq ft. A 15 by 20 addition is $48,000 to $65,000 |
| Design and drawings | $500 to $2,000 | Carried inside a design build contract |
| Permits | $300 to $800 per trade permit | $300 to $800 per trade permit, more once structure changes |
| Contingency | 10 to 15 percent on a 1980s or 1990s house | 15 to 20 percent on anything pre-1970 |
Add those up and the two tiers make sense. A kitchen, two baths, floors, and paint lands in the $75,000 to $150,000 selective band. Add a rewire, a repipe, structural repair, and moved walls and you are in the $150,000 to $300,000 gut band. Systems work is what moves a house from one band to the other, and on a 1920s frame house near downtown it usually does. Compare line items in our 2026 kitchen budget guide, the Tampa Bay bathroom cost guide, or the 15 by 20 addition breakdown.
Timeline for a Plant City Whole-Property Remodel
| Phase | Typical duration | What happens |
|---|---|---|
| Walkthrough and scope | 1 to 2 weeks | Every structure on the parcel gets measured, house, garage, shop, barn. Well and septic get identified before anything is drawn |
| Design, selections, fixed price | 3 to 6 weeks | Drawings, structural notes, and every finish selected and ordered so nothing stalls the build later |
| Permit review | 2 to 4 weeks | Filed with the City of Plant City inside the city limits, Hillsborough County outside them. Septic changes run on a separate state review |
| Demolition and structure | 2 to 4 weeks | Gut, then framing repair, rot repair, and wall removal. This is where an older frame house tells you the truth |
| Systems rough in | 3 to 5 weeks | Rewire, repipe, HVAC, then rough inspections before anything closes |
| Drywall, trim, cabinets | 4 to 6 weeks | Board and finish, doors and trim, cabinets set, countertops templated after the boxes are level |
| Tile, floors, paint, fixtures | 4 to 6 weeks | Wet areas first, floors late, paint worked around both |
| Outbuildings and exterior | Runs in parallel | Barn, shop, or detached garage work carries its own permit and its own crew, so it does not queue behind the house |
| Punch and final inspections | 1 to 2 weeks | Finals, walkthrough, sign off, and the last payment |
Selective renovations run 3 to 4 months and complete gut renovations 4 to 6. The two things that add months are almost never construction. They are decisions that arrive late and a septic or well question nobody asked at the start.
Permitting, Older Homes, and Acreage in Plant City
Plant City runs its own building department, which catches people off guard because so much of the surrounding area is unincorporated county. Inside the city limits, which covers downtown, the streets around the historic district, and neighborhoods like Walden Lake, your permit and your inspections come from the City of Plant City. Outside that line, in the unincorporated stretches toward Turkey Creek, Trapnell, Springhead, and Dover, you file with Hillsborough County. Parcels on the edge are not obvious from a mailing address, so we confirm jurisdiction off the parcel before anything gets drawn. Filing with the wrong office does not only waste a fee, it costs the 2 to 4 weeks of review you already put in the schedule.
The housing near downtown is largely 1900s to 1930s frame, a good amount of it craftsman, and it is built nothing like a modern Florida house. Expect pier and beam floors over a crawl space, heart pine joists and subfloor, board sheathing instead of plywood, plaster or early gypsum walls, and single pane wood windows. Wiring is usually a mix of cloth-jacketed circuits and whatever got added in the 1970s, and the supply lines are galvanized that has corroded down to a fraction of its original opening. None of that is a reason to walk away from the house. It means the systems line in the budget is real money, and the framing is worth saving, because you cannot buy heart pine anymore. If the address sits inside the downtown historic district, exterior changes like windows, porch details, and siding can carry an extra review step, so we get that answered before anything is ordered.
Outside the city line the parcels get bigger and the scope stops being just the house. On five and ten acre properties we regularly work on a barn, a pole building, a detached garage, or a shop alongside the main remodel. Detached structures carry their own permit and their own inspection track, which helps the schedule, because that crew is not waiting on the house. Converting one to conditioned space is a bigger conversation than most people expect. It needs its own service or a subpanel, insulation and a moisture plan for a building never meant to be sealed, and it has to meet code for the use you have in mind, a different standard for a workshop than for a room somebody sleeps in. An agricultural building that was never permitted as habitable space does not become habitable space by adding drywall.
Most property past city utilities runs on a private well and a septic system, and both put hard limits on a remodel. Septic capacity is tied to the design load of the drainfield, and bedroom count drives that number. Adding a bedroom in an addition, or converting a bonus room into a fourth bedroom, can require a septic upgrade whether or not you touch a bathroom. That approval is a separate state onsite sewage review, not a city building permit, and it moves on its own schedule. On the well side, a second or third bathroom raises peak demand, so pump and pressure tank capacity gets checked before we add fixtures. Well water out here also carries iron and sulfur that will stain a new quartz top and pit a brushed finish inside a season, so treatment belongs in the budget before you spend $800 on a faucet. We ask this at the walkthrough, because finding out in month three changes the drawings.
Related CraftLine Pages
See the whole-home renovation guide, estimate with the cost calculator, or see Plant City bathroom remodeling.
What Homeowners Say
CraftLine is a licensed and insured Florida contractor and a NARI Tampa Bay member, with 93 Google reviews and a 5.0 rating.
Plant City Whole-Home Remodeling FAQs
How much does a whole-home remodel cost in Plant City?
A selective renovation runs $75,000 to $150,000 and a complete gut renovation $150,000 to $300,000. Additions run $95 to $250 per square foot.
Can you remodel an older Plant City farmhouse?
Yes. We handle the rewiring, repiping, and structural repair these homes usually need, and we plan around well and septic on rural properties.
How long does a whole-home remodel take?
A selective renovation takes three to four months and a full gut renovation four to six months, depending on scope and permitting.
Do you handle permits?
Yes. We pull the permits and manage inspections through the whole project, filing with the City of Plant City inside the city limits and with Hillsborough County outside them.
Can I live in the house during a whole-home remodel?
Sometimes, especially when the work is phased. For a full gut renovation it is usually easier to move out. We plan the sequence around what works for your family.
Do I permit through the City of Plant City or Hillsborough County?
It depends on whether the parcel sits inside the city limits. Inside the line, including downtown and Walden Lake, the City of Plant City issues the permit and does the inspections. Outside it, toward Turkey Creek, Trapnell, and Dover, it is unincorporated Hillsborough County. We confirm from the parcel rather than the mailing address and file either way. Review typically takes 2 to 4 weeks.
Can you remodel a barn, shop, or detached garage on the same contract?
Yes. Detached structures run on their own permit and their own inspection track, so that work happens alongside the house instead of behind it. Converting one into living space is a larger job than it looks, since it needs its own electrical feed, insulation, and to meet code for the use you intend.
We are on well and septic. Does that limit what we can do?
It limits bedroom count more than anything else. Septic design load is tied to bedrooms, so an addition can trigger a septic upgrade even when you are not adding a bathroom, and that goes through a separate state onsite sewage review. Wells need pump and pressure tank capacity checked before you add fixtures, and iron or sulfur in the water is worth treating before new fixtures go in.