A kitchen remodel in Palma Ceia typically costs $25,000 to $45,000 for a mid-range project and $45,000 to $80,000 and up for high-end custom work, with construction running 4 to 10 weeks. CraftLine Remodeling is a licensed and insured Florida design build contractor handling kitchens across Palma Ceia and South Tampa.

Palma Ceia Kitchen Remodel Costs

Kitchen Project ScopeTypical CostConstruction Time
Cosmetic refresh (paint, hardware, new counters and backsplash)$15,000 to $25,0002 to 3 weeks
Mid-range remodel (semi-custom cabinets, quartz, new layout)$25,000 to $45,0004 to 6 weeks
High-end or full custom (custom cabinetry, premium finishes)$45,000 to $80,000 and up6 to 10 weeks

Compare against our realistic kitchen budget guide or estimate yours with the free cost calculator.

Remodeling Palma Ceia Kitchens

The kitchens in Palma Ceia’s 1920s through 1940s homes were built for a different era, when the kitchen was a small, closed room at the back of the house. Today’s homeowners want that kitchen opened to the dining and living areas, but doing it well in a bungalow or Mediterranean revival home takes care. Walls in these houses are often plaster over masonry or load-bearing, the original footprint is tight, and the period details in the rest of the home set the design direction. The most common Palma Ceia kitchen project is removing the wall between the kitchen and the main living space, building full-height custom cabinetry that suits the home’s style, and adding an island where the footprint allows.

We respect what makes these homes special while bringing the kitchen up to date. That means custom cabinetry rather than stock boxes, natural stone or quartz, and careful structural work. We permit through the City of Tampa and check the older electrical and plumbing, which often need upgrading in homes this age.

What’s Included

  • Open-concept layout changes and load-bearing wall removal
  • Custom and semi-custom cabinetry that fits the home’s character
  • Quartz and natural-stone counters with tile or slab backsplash
  • Electrical and plumbing upgrades for older South Tampa homes
  • City of Tampa permitting, inspections, and structural engineering
  • A single point of contact from design through final walkthrough

What Goes Into a Palma Ceia Kitchen Budget

Custom cabinetry and stone counters carry most of the budget in these homes, since stock cabinets rarely fit the character or the odd dimensions of a 1930s kitchen. Opening a wall is the next major factor: if it is load-bearing or masonry, an engineered beam and structural work add cost. Older electrical panels and plumbing that need updating are common in Palma Ceia and worth planning for.

A mid-range Palma Ceia kitchen with semi-custom cabinets and quartz lands in the $25,000 to $45,000 range. A full custom kitchen with an island, premium cabinetry, natural stone, and a wall removal moves into the $45,000 and up tier.

How a Palma Ceia Kitchen Remodel Runs

Design and selections take a few weeks, then a City of Tampa permit window, then 4 to 10 weeks of construction depending on the layout change and structural work. We build time into the schedule for the surprises that come with century-old homes.

What Actually Adds Cost in a Palma Ceia Kitchen

Two houses a block apart can quote $20,000 differently on identical cabinets and counters. The gap is rarely the finishes. It is the panel, the drain line and the wall you want gone. These are the items we price separately in a 33629 kitchen so you see them before demo, not after.

What we find or what you wantWhat it takesCost
Non-load-bearing wall to the dining room removedDemo, plaster and drywall patch, floor transition, paint$1,500 to $5,000
Load-bearing or masonry wall removedShoring, engineered beam, posts carried to a footing, finishing$5,000 to $15,000
Sealed drawings for the beamSite visit, calculations, plans the City of Tampa accepts$500 to $2,500
60 or 100 amp service replaced with 200 ampNew panel and mast, TECO coordination, dedicated circuits$2,500 to $4,500
Sink or gas line moved for an islandReroute supply, drain and vent to the new location$2,000 to $4,500
Cast iron kitchen drain rusted throughReplace the affected run out toward the main$6,000 to $12,000
Plaster demo, out-of-level floor, framing repairSistered joists, subfloor leveling before cabinets setCarried as an allowance, settled at demo

On a house built before 1970 we hold 15 to 20 percent as contingency and spend it in front of you, with photos, rather than presenting it at the end. If a beam is likely, read our open concept kitchen remodel cost guide before you set a number, and our cabinet pricing guide if you are weighing custom against semi-custom.

Cabinets, Plaster and Original Floors

Nothing in a 1928 bungalow is plumb. Plaster over lath, or plaster straight onto clay tile in the Mediterranean revival houses, gives you a wall that wanders half an inch over eight feet. Stock cabinets carry a quarter inch of adjustment. That is why custom or semi-custom boxes with generous scribe stiles are the right call: the installer plans the wobble out at the ends of the run instead of fighting a gap behind the crown.

Then the floor. Original heart pine and oak run under the old cabinet base but stop at the old wall line, so pulling a wall leaves a strip of bare subfloor across the opening. Two honest answers. Lace new boards in and refinish the whole connected floor, which is the better result and the larger number. Or set a clean threshold and let the two floors read as two rooms.

Footprints are small, often 10 by 12 with a rear service porch behind. Annexing that porch is usually the cheapest square footage in the house. Islands want 42 inches of clear aisle and 36 as a hard floor, so a peninsula or narrow prep island is often the honest answer. Lots are narrow, so a large island top or a 48 inch range usually comes in off the alley.

Permits and Inspections Through the City of Tampa

Palma Ceia sits inside Tampa city limits, so the permit goes to the City of Tampa, not Hillsborough County. Kitchen work that moves plumbing, adds circuits, changes framing or ducts a hood needs one. Figure $300 to $800 and 2 to 4 weeks of review, longer when structural drawings ride along. If a wall is coming out, sealed engineering goes in with the submittal, so the engineer walks the house during design, not the week before demo. A panel change adds a TECO disconnect and reconnect booked around the electrical inspection.

Week by Week in a Palma Ceia Kitchen

WeekOn siteWhat an older house adds
1Protection, demo to the studs, plaster and cabinets outFloor and joists get inspected as they are exposed
2Beam and framing, rough plumbing, rough electrical, panel workCast iron and old branch wiring get replaced where found
3Rough inspections, insulation, drywall and plaster repairWall thickness matched so trim reveals still read right
4Cabinets set, scribed and leveled, counters templatedShimming and scribing to out-of-plumb walls
5Counters installed, backsplash, hood duct, appliancesDuct routing planned around original framing
6Fixtures, paint, floor lacing and refinish, final inspectionRefinish needs the house empty for cure time

Add two to four weeks for custom cabinet lead time, a beam, or a panel upgrade waiting on a utility appointment. If the hall bath is next, see our Palma Ceia bathroom remodeling page, or the full range of Tampa Bay remodeling services if the project keeps growing.

What Homeowners Say

CraftLine holds a 5.0 rating across 93 Google reviews. We are a licensed and insured Florida contractor and an active member of NARI Tampa Bay. You can see recent kitchen, bath, and whole-home projects in our project portfolio.

Frequently Asked Questions

Can you open up the kitchen in a Palma Ceia bungalow?

Usually yes, but it takes care. Walls in these homes are often load-bearing or masonry. We bring in an engineer, add a beam where needed, and permit the work through the City of Tampa.

Why does a Palma Ceia kitchen cost more than a newer home’s?

Older homes need custom cabinetry to fit their dimensions and character, plus electrical, plumbing, and structural work that newer homes do not. That hidden work is real and we price it honestly up front.

Do you do custom cabinetry that fits an older home?

Yes. Custom and semi-custom cabinetry is how we make a modern kitchen feel like it belongs in a 1920s or 1930s Palma Ceia home rather than fighting it.

How long does a Palma Ceia kitchen remodel take?

Plan on 4 to 6 weeks for a mid-range kitchen and 6 to 10 weeks for a high-end project with a wall removal and custom cabinetry.

Does a Palma Ceia kitchen remodel need a City of Tampa permit?

Yes, if you are moving plumbing, adding circuits, changing framing or ducting a hood. Palma Ceia is inside city limits, so it goes to the City of Tampa rather than Hillsborough County. Budget $300 to $800 and 2 to 4 weeks of review, plus extra time when sealed structural drawings are in the submittal. We file it and schedule every inspection.

Will my kitchen need an electrical panel upgrade?

Often. Plenty of Palma Ceia homes still run a 60 or 100 amp service sized for one small appliance at a time. A modern kitchen wants dedicated circuits for the range, dishwasher, disposal, microwave and refrigerator plus two countertop circuits. Replacing the service with 200 amp runs $2,500 to $4,500. We check the panel at the first visit.

Can the original hardwood floors survive taking the kitchen wall out?

Usually. The boards stop at the old wall line, so we lace new stock into the opening and refinish the connected rooms as one floor, which is the only way the patch stops showing. The limit is remaining thickness, since a floor sanded several times may not take another pass.

Get a Free Palma Ceia Kitchen Quote

Ready to start your Palma Ceia kitchen remodel? Schedule a free quote or call us directly at (813) 522-4359. We will walk the space, talk through your budget, and give you a clear plan and price.

Kitchen Remodeling Contractor in Palma Ceia