A kitchen remodel in Palma Ceia typically costs $25,000 to $45,000 for a mid-range project and $45,000 to $80,000 and up for high-end custom work, with construction running 4 to 10 weeks. CraftLine Remodeling is a licensed and insured Florida design build contractor handling kitchens across Palma Ceia and South Tampa.

Palma Ceia Kitchen Remodel Costs

Kitchen Project ScopeTypical CostConstruction Time
Cosmetic refresh (paint, hardware, new counters and backsplash)$15,000 to $25,0002 to 3 weeks
Mid-range remodel (semi-custom cabinets, quartz, new layout)$25,000 to $45,0004 to 6 weeks
High-end or full custom (custom cabinetry, premium finishes)$45,000 to $80,000 and up6 to 10 weeks

Compare against our realistic kitchen budget guide or estimate yours with the free cost calculator.

Remodeling Palma Ceia Kitchens

The kitchens in Palma Ceia’s 1920s through 1940s homes were built for a different era, when the kitchen was a small, closed room at the back of the house. Today’s homeowners want that kitchen opened to the dining and living areas, but doing it well in a bungalow or Mediterranean revival home takes care. Walls in these houses are often plaster over masonry or load-bearing, the original footprint is tight, and the period details in the rest of the home set the design direction. The most common Palma Ceia kitchen project is removing the wall between the kitchen and the main living space, building full-height custom cabinetry that suits the home’s style, and adding an island where the footprint allows.

We respect what makes these homes special while bringing the kitchen up to date. That means custom cabinetry rather than stock boxes, natural stone or quartz, and careful structural work. We permit through the City of Tampa and check the older electrical and plumbing, which often need upgrading in homes this age.

What’s Included

  • Open-concept layout changes and load-bearing wall removal
  • Custom and semi-custom cabinetry that fits the home’s character
  • Quartz and natural-stone counters with tile or slab backsplash
  • Electrical and plumbing upgrades for older South Tampa homes
  • City of Tampa permitting, inspections, and structural engineering
  • A single point of contact from design through final walkthrough

What Goes Into a Palma Ceia Kitchen Budget

Custom cabinetry and stone counters carry most of the budget in these homes, since stock cabinets rarely fit the character or the odd dimensions of a 1930s kitchen. Opening a wall is the next major factor: if it is load-bearing or masonry, an engineered beam and structural work add cost. Older electrical panels and plumbing that need updating are common in Palma Ceia and worth planning for.

A mid-range Palma Ceia kitchen with semi-custom cabinets and quartz lands in the $25,000 to $45,000 range. A full custom kitchen with an island, premium cabinetry, natural stone, and a wall removal moves into the $45,000 and up tier.

How a Palma Ceia Kitchen Remodel Runs

Design and selections take a few weeks, then a City of Tampa permit window, then 4 to 10 weeks of construction depending on the layout change and structural work. We build time into the schedule for the surprises that come with century-old homes.

What Homeowners Say

CraftLine holds a 5.0 rating across 93 Google reviews. We are a licensed and insured Florida contractor and an active member of NARI Tampa Bay. You can see recent kitchen, bath, and whole-home projects in our project portfolio.

Frequently Asked Questions

Can you open up the kitchen in a Palma Ceia bungalow?

Usually yes, but it takes care. Walls in these homes are often load-bearing or masonry. We bring in an engineer, add a beam where needed, and permit the work through the City of Tampa.

Why does a Palma Ceia kitchen cost more than a newer home’s?

Older homes need custom cabinetry to fit their dimensions and character, plus electrical, plumbing, and structural work that newer homes do not. That hidden work is real and we price it honestly up front.

Do you do custom cabinetry that fits an older home?

Yes. Custom and semi-custom cabinetry is how we make a modern kitchen feel like it belongs in a 1920s or 1930s Palma Ceia home rather than fighting it.

How long does a Palma Ceia kitchen remodel take?

Plan on 4 to 6 weeks for a mid-range kitchen and 6 to 10 weeks for a high-end project with a wall removal and custom cabinetry.

Get a Free Palma Ceia Kitchen Quote

Ready to start your Palma Ceia kitchen remodel? Schedule a free quote or call us directly at (813) 522-4359. We will walk the space, talk through your budget, and give you a clear plan and price.

Kitchen Remodeling Contractor in Palma Ceia