A kitchen remodel in Carrollwood typically costs $25,000 to $45,000 and takes 4 to 6 weeks of construction, with large open concept projects running $45,000 to $80,000 and up. CraftLine Remodeling is a licensed and insured Florida design build contractor. We handle design, Hillsborough County permits, cabinetry, counters, electric, and plumbing with one team and one timeline.
Kitchen Remodel Pricing for Carrollwood (2026)
| Kitchen size | Scope | Typical investment |
|---|---|---|
| Small (under 100 sq ft) | Cabinet refresh, counters, backsplash, lighting | $15,000 to $25,000 |
| Medium (100 to 200 sq ft) | New cabinetry, quartz counters, layout tweaks | $25,000 to $45,000 |
| Large (200+ sq ft) | Full reconfiguration, island, premium finishes | $45,000 to $80,000+ |
Dial in your own number with the free cost calculator or our Florida kitchen cost guide.
Where the Money Goes in a $35,000 Carrollwood Kitchen
Most contractors will give you a range and stop there. Here is how a mid range Carrollwood kitchen actually divides up, using a 150 square foot kitchen with semi custom cabinets, quartz counters, and no wall removal.
| Line item | Typical cost | Share of budget |
|---|---|---|
| Cabinetry, semi custom with soft close | $11,000 to $15,000 | 29 to 40 percent |
| Labor: demo, install, trades, tile | $8,000 to $11,000 | 20 to 35 percent |
| Quartz countertops, installed | $3,500 to $5,500 | 10 to 15 percent |
| Appliance package | $4,000 to $6,000 | 10 to 15 percent |
| Flooring, lighting, backsplash, paint, hardware | $3,500 to $7,000 | 10 to 20 percent |
| Permits and inspections, Hillsborough County | $300 to $800 | Under 3 percent |
Cabinets are the biggest number in nearly every kitchen, which is why we price them first and build the rest of the plan around what is left. If your budget is fixed, the honest conversation is about cabinet grade and layout changes, not about faucets.
Carrollwood Kitchens Have a Pattern
Original Carrollwood ranches from the 1960s and Carrollwood Village homes from the 70s and 80s share the same kitchen problems: closed floor plans, soffits stealing a foot of cabinet height, and peninsulas that wall the cook off from the family. The fix is usually the same move: open the wall to the family room, run cabinets to the ceiling where the soffit was, and replace the peninsula with an island. We have done it across Carrollwood Village, Original Carrollwood, and Plantation, and it changes how the whole house lives. Our Carrollwood home renovation guide covers the same two eras at the whole-house level, investment tiers and community standards included.
Two details show up over and over in this pocket of Hillsborough County. First, the soffit above the wall cabinets is usually hollow, but not always. Sometimes it hides a duct run or a vent stack that has to be rerouted before cabinets can go to the ceiling. We open a small inspection hole during the estimate so nobody finds out on demo day. Second, a lot of Carrollwood Village kitchens were built with a bulkhead over the peninsula holding recessed cans wired on a single circuit. Modern kitchens need more circuits than 1978 code required, so a panel check is part of every quote we write here.
What the Wall and Soffit Work Actually Costs
The single biggest swing in a Carrollwood kitchen budget is whether a wall comes out. Here is what those moves add on top of the base remodel.
- Removing a non load bearing wall: $1,200 to $2,500 including patching ceiling and floor
- Removing a load bearing wall with an engineered beam: $4,500 to $9,000 including engineering, beam, posts, and inspection
- Soffit removal and taller cabinets: $1,500 to $3,500, more if ductwork gets rerouted
- Relocating sink or gas plumbing to a new island: $2,000 to $4,500 in a slab home
- Electrical panel upgrade to 200 amp: $2,500 to $4,500 when the existing panel is maxed out
None of that is a surprise charge when the scope is written properly. We put these items in the quote before demo, priced, so you decide with real numbers instead of a change order in week three.
What Is Included
- Layout changes that improve flow, light, and storage
- Custom or semi custom cabinetry with soft close hardware
- Quartz, granite, or butcher block countertops
- Tile backsplashes and layered lighting
- Permits, inspections, and licensed electrical and plumbing, all handled by us
- A line item quote before demo, so you know what each choice costs
- Daily site cleanup and dust containment, because you are living here during the work
How the Schedule Runs, Week by Week
| Phase | Time | What happens |
|---|---|---|
| Design and selections | 2 to 3 weeks | Layout, cabinet order, counter and tile selections, final line item quote |
| Hillsborough County permitting | 1 to 2 weeks | Plan submittal and approval, longer if an engineered beam is involved |
| Cabinet lead time | 4 to 8 weeks | Runs in parallel with permitting, semi custom ships faster than full custom |
| Demo and rough in | Week 1 to 2 | Tear out, wall or soffit work, electrical and plumbing rough, inspection |
| Cabinets and counters | Week 3 to 4 | Cabinet install, then counter templating and a 7 to 10 day fabrication wait |
| Finishes and punch | Week 5 to 6 | Backsplash, lighting trim, appliances, paint, final inspection, walkthrough |
The counter templating gap is the part people do not expect. Your counters cannot be measured until the cabinets are set and level, and the fabricator needs about a week and a half after that. We schedule a temporary sink and prep area so the kitchen is not fully unusable for the whole stretch.
What Homeowners Say
CraftLine Remodeling is a licensed and insured Florida contractor and a member of NARI Tampa Bay. 93 Google reviews, 5.0 rating. You can see finished work on our Tampa Bay before and after showcase.
Kitchen Remodeling in Carrollwood: Common Questions
How much does a kitchen remodel cost in Carrollwood?
Most full kitchen remodels run $25,000 to $45,000. Opening walls and adding an island pushes projects into the $45,000 to $80,000 range. Cabinet refreshes that keep the existing layout start around $15,000. If you are still comparing companies, our analysis of Tampa Bay kitchen remodeling contractors explains what to weigh beyond the price, from credentials to customer satisfaction records.
Can you remove the wall between my kitchen and family room?
Usually yes. Many Carrollwood walls are load bearing, which means a properly engineered beam, a permit, and an inspection. That is normal work for us and included in the quote, typically $4,500 to $9,000 for the structural portion.
How long does it take?
Plan on 4 to 6 weeks of construction once materials arrive, plus 3 to 5 weeks for design and Hillsborough County permitting before that. Cabinet lead time runs alongside permitting rather than after it.
Do I need a permit for a kitchen remodel in unincorporated Hillsborough County?
Yes, any time the job moves plumbing, adds or relocates electrical circuits, or touches a wall. Most of Carrollwood is unincorporated Hillsborough County, so plans go to the county rather than the City of Tampa. Fees usually land between $300 and $800. We pull the permit, meet the inspector, and close it out.
Can I stay in the house during the remodel?
Almost everyone does. We set up dust containment at the kitchen opening, keep the refrigerator on a live circuit, and try to leave a temporary prep sink. The hardest stretch is the week or two between cabinet install and counter delivery.
Do you offer financing?
Yes. See our remodeling financing options for current programs.
Get Your Free In Home Estimate