A real to-the-studs bathroom remodel takes about 10 to 14 days and costs $18,000 to $50,000. A one-day remodel is faster and cheaper at roughly $4,000 to $9,000, but it covers your old surfaces with acrylic instead of fixing what is behind them. CraftLine is a licensed design build contractor and we build bathrooms the right way, on a 10-day schedule.
One-Day vs 10-Day vs Full Remodel
| Approach | What Happens | Tampa Bay Price | Time |
|---|---|---|---|
| One-day liner | Acrylic liner and walls over existing surfaces, no flooring or vanity | $4,000 to $9,000 | 1 to 2 days |
| CraftLine 10-day | To-the-studs rebuild of the wet area, real tile and waterproofing | $18,000 to $35,000 | 10 to 14 days |
| Full remodel | New layout, vanity, flooring, and fixtures | $30,000 to $50,000+ | 2 to 3 weeks |
See the full tier breakdown in our Tampa bathroom cost guide or estimate your bathroom in the free calculator.
The Problem With One-Day Remodels
A one-day remodel installs a custom-fit acrylic liner over your existing tub and walls. It looks new the day it is done. The issue is what it hides. An overlay cannot fix a soft subfloor, a rotted wall, or a failing moisture barrier, the exact problems older Florida bathrooms tend to have. Acrylic liners typically last 5 to 15 years, and the seams and joints are weak points where water gets in and damage spreads silently behind the liner.
- Seams and joints let water get behind the liner over time
- It cannot fix a spongy floor, hidden rot, or a bad moisture barrier
- Liners crack, lift, or discolor in 5 to 15 years
- Not every tub can be lined, and a musty smell means you need a real remodel
Why 10 Days Is the Honest Number in Tampa Bay
Florida humidity and decades-old plumbing make subfloor and moisture issues common in St. Petersburg, Gulfport, and South Tampa bathrooms. A 10-day to-the-studs build is the only way to open the wall, replace the moisture barrier, fix any rot, and waterproof correctly before new tile goes in. That is the difference between a bathroom that looks fixed and one that is fixed. Both Hillsborough and Pinellas require permits for this work, which also means an inspector verifies the waterproofing, something a one-day overlay skips.
What Homeowners Say
CraftLine Remodeling holds a 5.0 rating across 93 Google reviews. We are a licensed and insured Tampa Bay contractor and a NARI Tampa Bay member. You can see real before and after work on our Tampa Bay project showcase.
Frequently Asked Questions
Is a one-day bathroom remodel worth it?
Only if your bathroom is structurally sound and you just want a quick cosmetic update. If there is any hidden water damage, soft floor, or old plumbing, a one-day liner covers the problem instead of fixing it.
Why does a real bathroom remodel take 10 days?
A to-the-studs remodel has to demo, repair the subfloor and framing, install a moisture barrier, set the pan, waterproof, tile, and cure. Rushing that is how leaks and rot start. Ten to fourteen days is the honest schedule.
How much does a full bathroom remodel cost in Tampa?
A 10-day to-the-studs remodel runs $18,000 to $35,000. A full remodel with a new layout, vanity, and flooring runs $30,000 to $50,000 or more.
Do one-day remodels pass Florida permit inspections?
A true to-the-studs remodel is permitted and inspected in Hillsborough and Pinellas, so an inspector checks the waterproofing. Many one-day overlay jobs are sold as cosmetic and skip that verification, which is a real risk in humid Florida homes.
Get a Real Number on Your Project
Want a fixed price for your own home? Schedule a free quote or call (813) 522-4359. CraftLine is a licensed design build contractor serving Tampa, St. Petersburg, Brandon, and the rest of Tampa Bay.
